Smiths Concrete Stratford Upon Avon

A recent completed project at Smiths Concrete Stratford Upon Avon site. 

All work was completed and managed by STOCK ENGINEERING SERVICES.

  • The stone over head aggregate storage bin division walls top section has suffered from major delimitation and corrosion to its steel structure. 
  • The plan was put into place to bolt and fully weld new steel sheets into place forming a new good structural connection between the division wall sections this stoping cross contamination of the aggregate being stored inside the bins.