Kettering premix site

Smith’s Concrete and Heidelberg Materials instructed the works to take place at there Kettering premix site.

  • Decommission and dismantle the silos, arrange and plan the transportation of silos to there new homes. 
  • A full refurbishment was completed on the silo that was installed at Smiths Concrete Stratford Upon Avon site. 
  • A New Wham screw conveyor was installed to the silo. 
  • A Hycontrol silo protection system was installed along with a new Wham silo filtration unit.  
  • All integrations with the electrical systems and pneumatic systems was completed by STOCK ENGINEERING SERVICES.